A clear written contract is the best protection for you and your builder. It sets expectations, reduces arguments and gives you something to point to if things go wrong.

Photo: Scott Graham on Unsplash

Why put it in writing?

Most building disputes come from different expectations about what was agreed. A written contract records the job, the price and the rules for changes, so both sides know where they stand. For anything more than a small job, do not rely on a verbal agreement or a one-line quote.

What the contract should cover

  • The parties: your name and the builder’s full business name and address.
  • Scope of work: refer to the drawings and a written specification, including materials and finishes.
  • Price: whether it is fixed or an estimate, whether VAT is included, and what is excluded (for example skips, making good, decorating).
  • Payment stages: amounts linked to completed stages of work, with a sum held back until the end.
  • Dates: start date, expected finish date and what happens if the work runs late.
  • Changes (variations): how extra work or changes will be priced and agreed in writing before they happen.
  • Permissions: who is responsible for planning, Building Regulations, party wall notices and certificates.
  • Site rules: working hours, access, parking, toilet use, waste removal and tidying up.
  • Insurance: the builder’s public liability and, for bigger jobs, contract works insurance.
  • Guarantees and defects: how snagging and defects after completion will be dealt with.
  • Disputes: how disagreements will be resolved, such as through a trade body or adjudication.

Ready-made contracts

You do not have to write a contract from scratch. The Joint Contracts Tribunal (JCT) publishes Home Owner contracts designed for homeowners in England and Wales hiring a builder for small domestic works such as extensions and alterations, with versions for when you have, or have not, appointed a consultant such as an architect. Some trade bodies also provide contracts for their members’ customers.

Your rights still apply

Whatever the contract says, the Consumer Rights Act 2015 means a trader must carry out the work with reasonable care and skill. If the contract is agreed in your home rather than at the builder’s premises, you usually have a 14-day right to cancel, and the builder must tell you about it in writing.

Before you sign

  • Read every page, including the small print.
  • Make sure the drawings and specification are attached or referenced.
  • Check the payment stages match the work, and avoid large upfront payments.
  • Keep a signed copy.

See our guide to choosing a builder, and compare local builders.

Last updated: 14 October 2026

Frequently asked questions

Do I need a written contract with my builder?
It is not a legal requirement, but for anything more than a small job a written contract is strongly recommended. It protects both you and the builder.
What is a JCT Home Owner contract?
A standard building contract published by the Joint Contracts Tribunal for homeowners in England and Wales carrying out small domestic works, such as extensions and alterations.